How We Quote

Small-machine excavation with Track On Terra is charged by the hour, operator included, for our Bobcat E17z excavator or Bobcat S70 skid steer. We work from Bacchus Marsh to Melbourne’s west, including Gisborne, Ballarat, Ballan, Melton, Caroline Springs, Eynesbury, Werribee, Lara, West Melbourne and Geelong.

Contact Us

Tell us about the job and we’ll get back to you.

  • Every job comes with an operator
  • We don’t dry hire

What excavation costs

For a small job around a house, most of the cost is machine time. You pay for the hours the machine and the operator are on your site, with a minimum charge so a short job still covers getting the machine there.

If dirt or rubbish has to leave your block, we load it into a skip bin, arranged either by us (built into the job price) or by you. Tip fees are built into the job price, never added on. There’s no travel charge anywhere we work, except jobs on the eastern side of Melbourne, which carry one. Everything else comes back to hours: how narrow the way in is, what’s in the ground, and the quantity to be carried out.

What changes the price

  • Time on site.The biggest part of most bills. Open ground and soft soil go quickly. A narrow gate, rock, tree roots or old concrete slow the machine down, so the same job takes more hours.
  • Access.Through a side gate, every bucket of dirt travels further, one load at a time. It’s the same amount of digging, it just takes longer, and we’d rather you know that before we start.
  • The ground.Clay and soft soil dig well. Rock and old buried concrete are slow.
  • Where the dirt goes.Dirt that stays on your block, spread or levelled, costs machine time and nothing else. Dirt that leaves costs the time to load it into a skip bin, arranged either by us (built into the job price) or by you.
  • Distance.There’s no travel charge anywhere we work, except jobs on the eastern side of Melbourne, which carry one, and we tell you before you book.
  • The minimum.Even a short job means getting the machine to you and set up. That’s why there’s a minimum charge. If your job is under it, ask what else we could do while the machine is there.
Bobcat E17z mini excavator working in a footing excavation beside a clad wall

Why we charge by the hour and not by the cubic metre

Bobcat E17z mini excavator beside a plant trailer, with a white truck behind

People often ask for a price per cubic metre. For a backyard job it isn’t a fair way to price. A cubic metre of soft soil on an open block comes out fast. The same cubic metre of clay, carried out through a side gate one bucket at a time, takes far longer. Dirt also takes up more room once it’s dug than it did in the ground, so the hole and the pile it makes aren’t the same size. Charging by the hour means you pay for the time your job takes.

Questions about cost

Bobcat S70 skid steer and mini excavator on a levelled red-soil site beside a portable building
How do I calculate the cost of excavation?

Add three parts together. First, machine hours times the hourly rate, with the minimum charge as the floor. Second, a skip bin if any dirt has to leave. Tip fees are built into our price, not added on. Third, any travel charge. On a small job the hours depend most on access and ground, so send photos.

How much is excavation per m3?

We don’t price by the cubic metre, because on a backyard job the same amount of dirt can take very different time, depending on the ground and how the machine gets in. We price by the machine hour instead. If you know roughly how much dirt is coming out, tell us, and we’ll turn it into hours.

How to charge for digging a trench?

Trenches are usually priced by the metre or by the hour. We use the hour, the same as every other job, so the length, the depth and the ground are all covered by how long the machine takes. Tell us how long and how deep the trench needs to be, and send a photo of where it runs.

Is there a minimum charge?

Yes. Every job has a minimum, because getting a machine to your place and set up takes the same time whether the job is one hour or six. If your job is short, ask what else needs doing nearby, like a few post holes, and we’ll do it while the machine is there.

Are tip fees included in the price?

Yes. Tip fees are built into the job price, so they never show up as a separate charge. Waste leaves your site in a skip bin, which can be swapped for an empty one when it’s full. That keeps the operator working on your job instead of driving loads to the tip.

How much does a site cut cost?

It depends on how big the cut is, how steep the slope is, and whether the dirt can stay on your block. We take on small cuts, like a pad for a shed, a garage or a small extension, and price them by the machine hour like every other job. Send a photo of the slope and the way in.

What happens if you hit rock?

We stop and tell you before we keep going. Rock is slower to dig than clay, so it can add hours. Nothing gets added to the bill without you knowing.

Why do prices for the same job vary so much?

Mostly because operators price in different ways. One charges by the hour, one by the metre, one by the cubic metre, and one gives a single figure. To compare them, ask each for the machine hours, the minimum charge and what getting rid of the dirt costs. Then you’re comparing the same things.

Contact Us

Text a photo of the job and the way in to 0409 067 823, or use the form. Tell us your suburb, and we’ll talk through the hours your job needs.