Levelled crushed-rock pad on a rural block, with a skid steer, a mini excavator and soil heaps

Site Cuts and Levelling in Bacchus Marsh and Surrounding Suburbs

A site cut is digging a sloping block down to a flat, level pad so a shed, a garage, a slab or an extension can go on it. We do small site cuts and ground levelling across Bacchus Marsh and surrounding suburbs with a Bobcat E17z excavator and a Bobcat S70 skid steer, and every job comes with an operator.

Contact Us

Tell us about the job and we’ll get back to you.

  • Every job comes with an operator
  • We don’t dry hire

Cut and fill

Cut is the soil taken off the high side of a slope. Fill is soil put on the low side to build it up. On a small pad the two can often balance, so the dirt that comes out of the slope gets spread on the low side instead of leaving the block. When there’s more cut than fill, the extra goes into a skip bin on site, and that’s the part that moves the price most.

Fill goes down in thin layers and is packed hard as it goes, so it doesn’t sink under a slab later. Your builder or concreter sets the finished height. We work to the builder’s discretion.

Site cuts and levelling we do

  • Shed and garage pads.A flat base cut into the slope, the size of the shed or garage plus room to work around it, ready for the slab or the piers.
  • Extension cuts.Taking the ground down beside the house to the height on the plans, so the concreter or the formwork crew can get started.
  • Backyard levelling.Taking the slope out of a yard, or fixing a spot that falls the wrong way, so it’s ready for lawn, paving or a play area.
  • Driveway and path boxing.Digging out to an even depth so the crushed rock or the concrete goes in on a firm, flat base.
  • Cuts behind a gate.Tight blocks where the only way in is down the side of the house. Our tight access page explains how we check the gate.
Freshly levelled red-soil pad on a rural block, with a laser level on a tripod

What we don’t do

We don’t dry hire, so this isn’t a machine you pick up and run yourself. We take on small site cuts for sheds, garages, extensions and tight blocks. For a full house pad on a sloping block, ring us first and we’ll tell you if it’s a job for us.

What a site cut costs

Bobcat E17z mini excavator beside a plant trailer, with a white truck behind

The price depends on how much dirt has to move, where it ends up, and what the ground is like. A cut where the soil can be spread on the low side costs less than one where it all has to go into a skip bin. Rock, heavy clay and old tree roots slow the machine down.

Access counts too. A block you can drive straight onto is quicker than a backyard where every bucket goes out through a gate. Send the size of the pad and a photo of the slope, and we’ll talk the whole job through with you before we price it.

Our How We Quote page explains how we charge.

How a site cut works

  1. Levels first.

    Your builder or concreter gives us the finished height and the size of the pad. We mark it out before the machine starts.

  2. Pipes and cables.

    You tell us where your water, power, gas and sewer run, and we dig around them.

  3. Cut and fill.

    The high side comes down, the low side builds up, and the fill gets packed down.

  4. Hand over.

    The pad is ready for the next trade.

Large levelled crushed-rock pad among olive trees

Site cut questions

Bobcat S70 skid steer and mini excavator on a levelled red-soil site beside a portable building
How long does a site cut take?

It depends on the size of the pad, how steep the block is, and whether the dirt can stay on site. A shed pad on an open block is a short job. A garage cut behind a gate, with every bucket carried out, takes longer.

How much does a site cut cost?

The price comes from how much soil moves and whether it can stay on your block. A small pad with the dirt spread on the low side is the cheaper end. A deeper cut where it all goes off site costs more. Send the pad size and a photo, and we’ll go over it with you.

What is levelling in construction?

Levelling is getting the ground to the height and fall the plans ask for, so a slab sits flat and water runs away from the building. On a small job that means cutting the high spots, filling the low ones and packing the fill hard. The builder’s plans set the height.

What happens to the dirt from a site cut?

Where there’s room, we spread it on the low side of the block and pack it down, which is the cheapest way. When there’s more than the block can take, the rest goes into a skip bin on site, which goes on your bill.

Can you cut a pad in a backyard behind a gate?

Yes, if the gate’s wide enough. The mini excavator needs about a metre, and the skid steer that carries the dirt out to the skip bin needs about 1.15 metres. Posts, a step or a tight corner at the back can matter as much as the gate. Send a photo of the gate and we’ll tell you whether we fit.

Can you work to my builder’s levels?

Yes. Give us the finished floor or slab height from the plans, or have the builder mark it on site, and we cut to that. If nobody has set a level yet, sort that with your builder or surveyor before we start, because it decides how much dirt moves.

Planning a site cut?

Ring or text 0409 067 823 with the size of the pad, what’s going on it and a photo of the slope. We’ll ring you back to talk the cut through.