Getting the machine in
Send a photo of the access with something in it for scale. A wheelie bin, a door, a person. From that we can tell you which machine fits and whether anything needs to come off a fence first.
Our Bobcat E17z excavator needs a gap of about a metre.
Our skid steer needs about 1.15 metres, so where the narrowest point is less than that, only the excavator gets in.
Width isn’t the only thing.
Height and tight turns matter too. A carport beam, a low branch, a tight corner between the house and the fence. Those show up in the photo, which is why we ask for it. If it looks like a squeeze, we’ll ask for a tape measure across the narrowest point, not just the gate.
Jobs we do through a side gate
- Backyard site cuts.Levelling a sloping part of the yard for a shed, a garage slab or an extension. See site cuts and levelling for how that job runs.
- Trenching down the side of the house.Drainage, stormwater, power to a shed, water to a tap. Dug to the depth your plumber or electrician asks for. More on our trenching page.
- Post holes in tight spots.Fence lines against a boundary, deck footings, pergola posts in a closed-in yard where a truck-mounted auger can’t reach. See post hole drilling.
- Taking out what’s there.Old paths, a concrete slab, a retaining wall, a garden shed. Carried out the way the machine came in.
- Getting the dirt out.Everything we dig goes back out through the same gap, and we load it into a skip bin on site.

What we don’t do
We don’t dry hire. Both machines come with an operator. If you need a machine without someone to drive it, we’re not the right call. We also won’t guess at a gate from a phone description, so the photo comes first.
What decides the price

How long the machine is on site, and how much has to be carried out. A backyard job through a gate can take longer than the same job on an open block, because everything moves in and out one bucket at a time.
The dirt is the part people forget. Soil takes up more room once it’s dug than it did in the ground, so a small hole can make a bigger pile than you’d think. It all goes into a skip bin we organise, and the skip is built into the job price.
Our How We Quote page sets out how we charge.
How it works
Photos first.
Send a picture of the job and a picture of the way in, with a wheelie bin or a tape measure in shot.
We talk it through.
We look at what you’ve sent, tell you if our machines fit, and talk through the job with you before we price it.
We get the machine in.
Through the gate or down the side, the way we checked in the photo.
Dig, load, leave it tidy.
Everything we dig leaves through the same gap the machine used, a bucket at a time, into a skip bin on site.

Can you get through a narrow side gate?
It depends on the gate. Our excavator needs about a metre and our skid steer about 1.15 metres. The posts, a meter box or a downpipe can leave less room than the gate itself. Send a photo with a tape measure in it and we’ll give you a straight answer before you book.
Do I need to pull down the fence?
If a panel has to come out, we’ll tell you when we talk it through. The photo is what decides it, so send one before you touch the fence. A picture of the gate with a tape measure across it is the most useful one.
Why pay for an operator instead of hiring a machine?
A hire machine means learning to run it first, and that’s slow going in your own yard, around your own pipes and paths. With us, the machine comes with an operator who knows it. You also don’t have to organise getting a hire machine delivered and picked up.
How does the dirt get out of a backyard?
The same way the machine got in. Where the way in is about 1.15 metres or wider, the skid steer carries it out a bucket at a time and tips it into a skip bin on site. Nothing goes over the fence.
Can you get in if there’s no side access at all?
Not if there’s no gap at all. Our machines have to drive in, so we need a gate, a side path or a fence panel that can come out. If the house runs boundary to boundary, a neighbour’s yard may be the only way, and that needs their okay first. Send photos and we’ll tell you what’s possible.
How much does tight access digging cost?
More than the same dig on an open block, because every bucket has to travel further to get out. How long the machine is on site and how much dirt has to leave are what set the price. Send photos of the job and the access, and we’ll go through it with you.
Talk to us about your tight access job
Ring or text 0409 067 823 with a picture of the access and a picture of the job. We’ll tell you if our machines fit, then talk the job through with you.



